Moving to a new office

Moving office in the Netherlands, and your internet line

A fiber line does not move with you. The new address gets a new line, and a dedicated fiber line needs 6 to 24 weeks. Start as soon as the lease or purchase is agreed, and ideally have the new address checked before you sign.

Within three months, the building decides the route

Three months is about 13 weeks. Whether a dedicated line is ready in time depends on where the fiber lies at the new building. If it is already in the building and you order now, the line usually makes your moving date. If it is in the street or the network has to dig further, you work over 5G for the first weeks.

If the building already has a connection point for shared fiber, that usually works within 1 to 5 working days. Which situation applies, we check for you at no cost.

Fiber in the building
6 to 13 weeks
Fiber in the street
14 to 18 weeks
Network digs further
16 to 24 weeks
Shared fiber, connection point in place
1 to 5 working days

The move runs in six steps

  1. Have the address checked. Ideally before you sign. Whether the fiber is in the building or in the street can save months and sometimes installation costs.
  2. Request the line with a preferred delivery date. Straight after signing. If you leave the date open, the network delivers as soon as it can.
  3. Survey in the building. A technician of the network decides where the fiber comes in. Arrange access with the landlord or the previous occupant. If you rent, the owner also has to consent, and that can take time.
  4. Place 5G if the fiber comes later. An outdoor antenna is in place within a few working days. Have it installed a week before the moving date, so you can test everything in time.
  5. Run old and new side by side. Once the new line is delivered, we set up the router and test everything. In that period you change your IP addresses, see below.
  6. Cancel the old line. Only when the new one works. The notice period is one month.

The network inside the new building, with cabling, switches and Wi-Fi, can often be installed while the fiber is being built. Then everything works on the day of delivery.

What a move roughly costs

Dedicated fiber line
200 Mbit/s from €299 and 500 Mbit/s from €345 a month, on 36 months and excluding VAT. These prices apply on business parks; elsewhere €50 a month is added. A 12-month term is possible too; its price is in the quote.
Installation
If the fiber is already in the building or the street, installation is usually free. If the network has to dig further, you get a fixed price up front and we look for the cheapest route.
5G for the weeks in between
Outdoor antenna Standard from €69, Premium with a fixed IP address from €95 a month. If you also take a dedicated fiber line from us, a standard installation is free.
The overlap
The new line is billed from delivery, even if nobody works there yet. A few months of two lines is part of a move.
Shared fiber is often enough for an office
If the new building already has a connection point, shared business fiber is the quickest route, complete with router, 5G backup SIM and management from €75.50 a month. Choose a dedicated line when the office cannot work without internet and you want a fixed repair time.

All prices

Old and new run side by side for a while

Make sure the new connection works before you cancel the old one. Networks treat a move as cancelling the old line and installing a new one, even when the new building is a few streets away. If you cancel the old line before its term ends, you pay the remaining months. The rest of an old contract is usually not offset against the new line.

If your moving date shifts, tell us straight away. Once the delivery date is fixed with the network, cancelling can cost up to a year of monthly fees.

The glass switch of a dedicated line stays at the old address until the network collects it. After the cancellation the network contacts your contact person. If it is not returned, it is charged. Include it in your agreements with the landlord of the old building, so the technician can still get in after you leave.

The new building may already have a line from the previous occupant. Then the fiber is there, which usually gives the shortest lead time. Whether that line can be taken over depends on the contract with the network. We check it, and if it works it goes as a switch on the existing line. A photo of the box where the fiber comes in, with its labels, helps the network see what can be used.

A new address means new IP addresses

The IP addresses of the old line do not move to the new address. Everything that is now set up on your current IP address needs the new one:

  • rules in your firewall;
  • VPN connections with another site or with remote workers;
  • DNS records, for example for a mail server or cameras you view remotely;
  • whitelists at other parties, such as a software supplier or a cloud package that only accepts connections from your address.

The last one is forgotten most often. Because the new line runs next to the old one for a while, you add the new address everywhere while the old one still works. If you depend on many whitelists and move more often, your own IP space with BGP can help: those addresses move with you to the new address. For an IT team abroad this is the list to send over early.

5G covers the weeks without a fixed line

If the new building is available before the fiber, 5G is the connection. The outdoor antenna Standard reaches up to 500 Mbit/s download and 50 Mbit/s upload and gets an IP address that can change. The outdoor antenna Premium uses all frequency bands, has no speed cap and has a fixed IP address. If the 5G line must already work with your VPN or with whitelists, or many people make video calls at the same time, choose Premium. What you get at the new address differs per location; if in doubt, we measure first.

Once the fiber works, it becomes the main line and the 5G can stay as the backup. If the fiber fails, the router switches over by itself. An outdoor antenna has a 24-month term; 12 months is possible too. What the antenna costs as a backup after delivery is in the quote beforehand.

How 5G works as a backup

The checklist for business internet when you move

As soon as you have a building in mind

  • Have the address checked: is the fiber in the building, in the street or further away?
  • Ask whether a connection from the previous occupant is still there. A photo of the box where the fiber comes in, with the labels, helps.
  • Choose between shared business fiber and a dedicated line.

Straight after signing the lease

  • Request the new line with the moving date as the preferred delivery date.
  • If you rent, ask the owner's consent for the connection.
  • Arrange access for the survey by the network's technician.
  • If the lead time is longer than the time until the move, plan 5G for the first weeks. It is usually in place within 5 working days.

In the weeks before the move

  • Have cabling, switches and Wi-Fi installed in the new building.
  • List everything set up on your current IP address: firewall rules, VPNs, DNS records and supplier whitelists.
  • Give a payment terminal its own data SIM, so card payments work from day one.

Around moving day

  • Run old and new side by side and change the IP addresses while the old one still works.
  • Test internet, telephony, card payments and remote access before people start working.
  • If you have a dedicated line now, agree with the landlord of the old building how the network collects the glass switch.
  • Cancel the old line once the new one works. Count on one month's notice.

Questions we often get

How far ahead should we arrange internet for a new office?

As soon as the lease or purchase is agreed. A dedicated fiber line needs 6 to 24 weeks, depending on where the fiber lies. Shared fiber works within a few working days when the building already has a connection point, otherwise often only after 50 working days or more.

Does our fiber line move with us?

No. A line belongs to the address. The new address gets a new line with a new lead time, even when the building is a few streets away.

Do we keep our IP address when we move?

No, the IP addresses of the old line do not move along. Let old and new run side by side for a while, so you can change firewall rules, VPNs and whitelists while the old address still works. With your own IP space and BGP the addresses do move with you.

What if the fiber is not ready in time?

Then you work over 5G with an outdoor antenna for the first weeks. It is usually in place within 5 working days. Once the fiber is in, the 5G can stay as the backup line.

We are setting up a new Dutch site from abroad. Can you work with our project team?

Yes. We check the address, order the line, plan the survey and installation with your people or your contractor on site and keep your project team informed in English. Your own IT team can keep its firewall or SD-WAN.

More for international companies

Business fiber installation
Shared fiber or a dedicated line, and how installation works.
5G backup next to your fiber
The router switches to 5G when the fiber fails. From €19 a month.
Fixed IP or CGNAT
When you need a fixed public IP address, and how to see if you are behind CGNAT.
For IT teams abroad
We handle the Dutch networks and the installation; your team keeps its own firewall or SD-WAN.

Have the new address checked at no cost

Then you know which networks are there, what a dedicated line costs and how long it takes. Send us the address and the moving date. You hear from us within one working day, by phone if you leave a number, otherwise by email.